Maike (Zhejiang) New Materials Co., Ltd.
Add:Xindeng Town Industrial Park (Songxi Village), Fuyang District, Hangzhou City, Zhejiang Province
Tel:0571-63559868
Update time:2021-07-10
China Sewage Treatment Engineering Network reported that the Changchun Lianhua Mountain Water Supply Pipeline Project has been approved by the Changchun Lianhua Mountain Eco-tourism Resort Development and Reform Bureau with the Changlian Development and Reform Document [2021] No. 35. The construction funds are district-level fiscal funds and have been implemented. The project owner is the Construction Bureau of the Management Committee of Changchun Lianhua Mountain Eco-tourism Resort.
Construction site: Changchun Lianhua Mountain Eco-tourism Resort.
Construction scale: Water supply pipeline network project, the pipe diameter is DN400mm-DN600mm, and the total pipeline length is 25329m.
Planned investment: feasibility study estimated total investment of 86.129 million yuan (including: engineering cost of 68.912 million yuan; survey fee of 758 thousand yuan; design fee of 2.5062 million yuan.)
It is currently in the stage of survey and design bidding.
Copyright © 2021- Maike (Zhejiang) New Materials Co., Ltd. All Rights Reserved. 技术支持:腾云建站仅向商家提供技术服务 a>Map